Victorian Semi - Thornton Heath, South London

An attractive Victorian semi-detached solid wall property in Thornton Heath, falls within the 'hard-to-treat' category, to avoid losing as much as 45% of heat through untreated walls this property has been thermally improved with the use of webertherm XM external wall insulation system.

The owner of this 19th century property, Ian McMeeken, has spent a lifetime career in the construction industry and has become one of the leading energy saving experts.  Having reviewed the thermal efficiency and energy requirement of his own home he took the decision to apply External Wall Insulation (EWI) to the property.  His current role as senior contracts manager at Wates Living Space involves undertaking energy saving and sustainability research projects and with his experience, Ian is confident that the application of EWI will dramatically improve the property’s energy efficiency.

Having many expert contacts in the construction industry Mr McMeeken quickly settled on the benefits of the webertherm XM EWI system and secured the services of Network Weber approved applicator Ser Contractor Limited, Mitcham, Surrey. The Victorian facade of the house includes many attractive stone cornice and filigree motifs which needed to be either removed and replaced or re-modelled and installed once the Weber EWI system had been applied.

“I was insistent that we retained all the architectural details that make these period buildings so pleasing on the eye. I have 20 years’ experience of recasting concrete cills and of using latex moulds to replicate illustrative stonework on properties of all ages and architectural styles.  This has actually become a hobby of mine and I have a good understanding of working with glass reinforced plastic,” says Ian McMeeken.  “There was never any intention to cover the entire façade with EWI due to the complexity of the application, especially the front two-storey bay window.”  Here the intention is to apply internal wall insulation to complete the property’s thermal upgrade

Costin Serban, managing director of Ser Contractor, and a team of six EWI installers provide a multi-skilled construction contractor service across London and the Home Counties. The team took personal responsibility for Mr McMeeken’s innovative and challenging project. “We are a Weber recommended EWI installer and our trade team members have attended the excellent theoretical and practical training courses offered by Weber at their Bedfordshire headquarters,” says Mr Serban. “With our combined application knowledge and Ian’s experience we wanted to make this project a real showcase.  We are confident it will attract more domestic EWI projects now that homeowners are able to reap the benefits of the Government’s Green Deal initiative.

Weber proactively works towards providing the best and most informative EWI training courses and this was positively reflected through the professionalism of the training instructor. My team really benefited from the information and practical experience.”

In the application of the webertherm XM EWI system, 90mm of graphite-enhanced expanded polystyrene (EPS) insulation panels were carefully and mechanically fixed to the original Victorian brickwork substrate by Costin Serban’s application team. This was followed with an initial coat of weberend LAC, meshcloth reinforcement, and a second layer of weberend LAC, a cement-based render mortar. The final decorative finish of webersil P, a high performance textured synthetic paint, provides a low maintenance decorative finish.

Ian says: “I had no reservation about using render-finished EWI over the solid brickwork elevations because there are adjoining rendered precedents and the new elevational treatment now actually fits into the streetscape better than the original, also planning permission was not required under the current permitted development rules.

“The webertherm XM EWI system was an easy choice for me having used it extensively and successfully in Wates projects.  Costin’s team did a comprehensive and excellent job in very quick time, just 17 days, including boiler and services modifications, roof works and bespoke encasements  to soil and waste pipes.  I am delighted with the end product and looking forward to a much warmer Winter this year!”

Click Compare to help you choose the right product for your project, if you need further assistance please email technical@netweber.co.uk