weberfloor fibre 4310

Weber UK

Packaging

  • 25kg

Self-smoothing base and renovation screed suitable for residential and commercial areas.

EPD

weberfloor fibre 4310 is a self-smoothing base and renovation screed — also referred to as a self levelling compound or self levelling screed — which can be applied to depths of 5-50mm used for levelling:
  • Concrete
  • Sand/cement screeds
  • Anhydrite screeds
  • Wooden boards
  • Underfloor heating/warming
  • Insulation boards
  • Existing tiles
  • Bitumen

weberfloor fibre 4310 is suitable for covering with:
  • Tiles
  • Timber laminate
  • Vinyl/ Linoleum
  • Carpet
  • Laminate flooring
  • Parquet flooring*


Suitable for use in residential and commercial areas, light foot traffic is possible after 2-4 hours in normal conditions, tiling is possible after 12 hours and final floor coverings other than tiles can be installed in as little as 3 days, depending on layer thickness and site conditions.


* May require extended time before covering

Tutorials and videos

Case studies

I4 Recruitment Agency – weberfloor fibre 4310
Flooring Systems

I4 Recruitment Agency, Norwich

weberfloor 4310 fibre flow pump-applied, fibre reinforced, levelling compound was the fast solution for I4 Recruitment Agency, Norwich.

weberfloor screeds used in extensive Weber HQ refurb
Flooring Systems

Weber HQ refurbishment

Major refurbishment has been completed at the Saint-Gobain Weber HQ in Flitwick, Bedfordshire where weberfloor products are being used extensively.

Woodside Leisure Centre, Watford after renovation using weberfloor screeds
Flooring Systems

Woodside Leisure Centre, Watford

weberfloor screed keeps everyone on their toes at Everyone Active Leisure Centre, Watford, Herts.

Hodgson Mazda, Newcastle-upon-Tyne
Flooring Systems Tile Fixing Products

Hodgson Mazda, Newcastle-upon-Tyne

This 330m² floor space accommodates new cars that offer a wide range of solutions to keep car and driver in perfect harmony

Weber UK
Flooring Systems

Principality Stadium, Cardiff

As part of an extensive upgrade project 220m2 of open basement floor area needed to be levelled, finished and ready to withstand foot traffic within a short timescale of just three days.

Our technical solutions

Click Compare to help you choose the right product for your project, if you need further assistance please email technical@netweber.co.uk

Compare